Hinesville Water
Reclamation Facility
Modifications
Project
Hinesville Water Reclamation Facility Modifications
Hinesville, Georgia
The scope of work for the project included: grading and paving a new on-site road with 1200 SY of granite roadway base and 264 tons of asphalt paving, drainage improvements, installation of new conduit with fiber optics and power cables, modifications to an existing blower building, installing valves, flow meters and stainless steel air pipe, fittings and expansion joints, relocating removal of digester equipment and installation of sequencing batch reactor equipment in an existing concrete basin, construction of 58’ diameter prestressed concrete basin and installation of all necessary piping and digester equipment, modifications to existing belt press building, and replacing existing grit and odor control systems.
- Owner: City of Hinesville
- Engineer: Simonton Engineering
- Estimated Completion: 2023