Hinesville CMAR Wastewater Treatment Plant

Hinesville, Georgia

This project consisted of the expansion and upgrade of the existing Water Reclamation Facility from 2.0 MGD to 4.0 MGD, along with the installation of approximately 20,000 LF of 24-inch force main through Fort Stewart to the Taylors Creek discharge pipe. Work included replacement of the existing headworks, installation of new SBR equipment within the existing tankage, construction of a parallel cloth filter system, upgrades to the UV disinfection system, and installation of multiple pumping stations to support the expanded capacity.

  • Owner: City of Hinesville
  • Engineer: Simonton Engineering
  • Estimated Completion: TBD