Pembroke
WWTP Project
Pembroke Wastewater Treatment Plant
Pembroke, Georgia
The scope of work for the project included: Construction of a new screen and grit structure; expansion of the water pollution control plant including an aeration basin, clarifier, digester, blowers, filters, UV disinfection system, and dewatering system; construction of a control building; and installation of associated electrical systems.
- Owner: City of Pembroke
- Engineer: M.E. Sack Engineering
- Estimated Completion: 2027