Folkston
WWTP Project
Folkston Wastewater Treatment Plant
Folkston, Georgia
The scope of work for the project included: Grading, dredging, and cleaning of the reject pond; construction of concrete driveways; installation of drainage pipes and structures; selective demolition; installation of electrical controls; erosion control and grassing; installation of a manual filter screen; construction of an influent pump station; installation of an SBR system; installation of a disk filtration system; installation of UV disinfection; construction of a reject pump station; installation of a sludge dewatering system; installation of an emergency power supply; and installation of a transformer.
- Owner: City of Folkston
- Engineer: M.E. Sack Engineering
- Estimated Completion: 2027