Folkston
WWTP Project

Folkston Wastewater Treatment Plant

Folkston, Georgia

The scope of work for the project included: Grading, dredging, and cleaning of the reject pond; construction of concrete driveways; installation of drainage pipes and structures; selective demolition; installation of electrical controls; erosion control and grassing; installation of a manual filter screen; construction of an influent pump station; installation of an SBR system; installation of a disk filtration system; installation of UV disinfection; construction of a reject pump station; installation of a sludge dewatering system; installation of an emergency power supply; and installation of a transformer.

  • Owner: City of Folkston
  • Engineer: M.E. Sack Engineering
  • Estimated Completion: 2027