The scope of work on this project includes: the construction of an altitude valve assembly, including associated isolation and check valves, piping and vault. This project also required the installation of an 80 gallon per minute booster package pump system, including electrical, SCADA, and all necessary appurtenances associated with the construction of the altitude valve and pump station as required to tie into the existing water and SCADA system.
Owner: City of Richmond Hill
Engineer: Thomas & Hutton
Estimated Completion: April 2025