Hinesville Sewer
System Upgrades
Hinesville Sewer System Upgrades
Hinesville, Georgia
This project consists of the installation of over 10,000 feet of force main ranging in size from 8-15” including directional bores under roadways. The project also includes the demolition and replacement of the existing equipment at Stonehenge Pump Station.
- Owner: City of Hinesville
- Engineer: Simonton Engineering
- Estimated Completion: August 2025