The work will include wet well cleaning, regrouting and recoating; pump removal and replacement; removal of below ground valve pits and placement above ground; electrical upgrades; bypassing of the station during construction; generator installation; and site grading and drainage.

  • Owner: City of Pooler
  • Engineer: Pittman Engineering Co., LLC
  • Estimated Completion: April 2026