Skip to main content

Lowcountry RWS – Elevated
Storage Tank Project

Lowcountry RWS – Elevated Storage Tank

The scope of work for the project included: preliminary site work necessary for the construction of the water tank; installation of valve vault and valves; yard piping; installation of drain box and drain piping; grading; paving; and fencing.

  • Owner: Lowcountry Regional Water System
  • Engineer: Thomas & Hutton
  • Estimated Completion: 2026

Let’s work together.

Contact us to find out how Southern Civil can help with your project.