Lowcountry RWS – Elevated
Storage Tank Project
Lowcountry RWS – Elevated Storage Tank
The scope of work for the project included: preliminary site work necessary for the construction of the water tank; installation of valve vault and valves; yard piping; installation of drain box and drain piping; grading; paving; and fencing.
- Owner: Lowcountry Regional Water System
- Engineer: Thomas & Hutton
- Estimated Completion: 2026