Scope of work on this project included: installation of the flow meter vault, plug valve manhole, and the air release valve manhole; installation of the generator and control panel maintenance pads; pump station mechanical piping; yard piping; installation of submersible pumps; Raven 405 Epoxy Coating on wet well and site manholes; installation of chain-link fencing; gravel paving.
Owner: Savannah Economic Development Authority
Engineer: Hussey Gay Bell
Completed: August 2020
Let’s work together.
Contact us to find out how Southern Civil can help with your project.