Southeast Quadrant
SWDI Project

Southeast Quadrant SWDI
Savannah, Georgia
The Scope of work for this project included: the construction of pipe culvert concrete end wall with Fabriform revetment and security bar grating for triple 48” RCP; the construction of two pipe culvert concrete end walls with Fabriform revetment and security bar grating for triple 60” RCP; the construction of a 14’x20’ concrete junction box with cover; the construction of a 18’x18’ concrete junction box with cover.
- Owner: Savannah-Hilton Head International Airport
- Engineer: Coleman Company
- Completed: September 2022