Skip to main content

BCMS Regional Pump Station

BCMS Regional Pump
Station Project

BCMS Regional Pump Station

Bryan County, Georgia

The scope of work for the project included: construction of a temporary pump station, complete with pump package, mechanical piping, and electrical; excavation, shoring and dewatering for cast-in-place concrete wet well; construction of cast-in-place wet well; wet well interior coating; provide and install submersible pump and control package; mechanical piping; provide and install generator and ATS; electrical upgrades; removal of temporary pump station; site gravel paving and fencing.

  • Owner: Bryan Co. Board of Commissioners
  • Engineer: Thomas & Hutton
  • Estimated Completion: 2024
  • bcms_pump_station4

  • bcms_pump_station3

  • bcms_pump_station2

Let’s work together.

Contact us to find out how Southern Civil can help with your project.

Continue reading

Hodgeville Lift Station #4 Improvements

Hodgeville Lift Station #4
Improvements Project

Hodgeville Lift Station #4 Improvements

Guyton, Georgia

The scope of work for the project included: construction of new wet well; purchase and installation of pump package, odor control unit, diesel bypass pumping system; construction of raised electrical control building; site paving; electrical and SCADA improvements; associated force main and gravity sewer piping; jack and bore installation and connections; demolition; installation of additional auxiliary equipment required for an operable station.

  • Owner: Effingham Co. Board of Commissioners
  • Engineer: Hussey Gay Bell
  • Estimated Completion: August 2023
  • hodgeville-ls

  • hodgeville-lift-station

  • hodgeville-ls-3

Let’s work together.

Contact us to find out how Southern Civil can help with your project.

Continue reading

I-16 Regional Water and Sewer Improvements

I-16 Regional Water
and Sewer
Improvements
Project

I-16 Regional Water and Sewer Improvements

Bryan County, Georgia

The scope of work for the project included: dewatering, shoring, and excavation required to install buried structures; installation of a 12’x12’ wet well; three plug valve manholes; 6’ collection manhole; Raven 405 Epoxy Coating of all buried structures; installation of Duplex submersible pump package; mechanical and yard piping; construction of maintenance pads; installation of generator/ATS; installation of site electrical package; site improvements.

  • Owner: Bryan County Board of Commissioners
  • Engineer: Thomas and Hutton
  • Estimated Completion: August 2023
  • 1-16-pump-2

  • deep_excavation_dji_fly

  • deep-excavation_dji

Let’s work together.

Contact us to find out how Southern Civil can help with your project.

Continue reading

Savannah Quarters Lift Station

Savannah Quarters
Lift Station Project

Savannah Quarters Lift Station

Pooler, Georgia

The scope of the project included Master Lift Station with three 79.1 hp submersible pumps, 7,440 LF of 18” PVC force main installed by open cut, 1,007 LF of 18” RJ PVC force main installed by open cut, 4,776 LF of 18” FPVC force main installed by horizontal directional drill,1,493 LF of 18” FPVC force main installed in 24” FPVC casing by horizontal directional drill, and 110 LF of 18” FPVC force main installed in 24” steel casing by jack and bore.

  • Owner: City of Pooler
  • Engineer: Hussey Gay Bell
  • Completed: June 2023
  • ps_savannah2

  • ps_savannah3

  • ps_savannah4

  • ps_savannah5

Let’s work together.

Contact us to find out how Southern Civil can help with your project.

Continue reading