McIntosh Water Systems Improvements

McIntosh
Water Systems Improvements

McIntosh Water System Improvements

McIntosh, Georgia

The McIntosh Well project includes the installation of erosion and sediment control measures, approximately 350 linear feet of 18-inch C900 DR 18 PVC water main, one fire hydrant assembly, pavement removal and replacement, and connections to existing water mains, along with all associated appurtenances.
Work also includes the installation of one (1) 1,500 GPM deep well pump, chlorine equipment, pump house, electrical components, metering systems, site piping, and a telemetry system to support operations.

  • Owner: McIntosh County Industrial Development Authority
  • Engineer: Hofstadter and Associates
  • Estimated Completion: TBD

Continue reading

Bryan-Bulloch Transmission Main – Phase 3

Bryan-Bulloch Transmission
Main Phase 3

Bryan-Bulloch Transmission Main – Phase 3

Bryan County, Georgia

This project had four divisions of work. Division I involved the furnishment and installation of approximately 4,800 LF of 30–inch water main, and 1,500 LF of 16–inch water main including the directional drilling and jack and bores. Division II is the construction of a new 1,800 GPM deep Floridan Aquifer water well, wellhead piping, well building, hydropneumatic tank, electrical components, SCADA. Division III requires the installation of a five-pump booster pump station including the site work, building, piping, all electrical, SCADA, concrete, and other accessories. Division IV includes the furnishment and installation of a five-pump booster pump station and meter station along Highway 80, site work, building for the booster pump station, building for the meter station, piping, electrical, SCADA, concrete, and other accessories.

  • Owner: Bryan Co. Board of Commissioners
  • Engineer: Thomas & Hutton
  • Estimated Completion: June 2026
  • bryan-bulloch-transmission2

  • bryan-bulloch-transmission

  • DJI_0739_web

  • DJI_0749_web

  • DJI_0766_web

  • DJI_0771_web

  • DJI_0794_web

  • DJI_0818_web

  • DJI_0799_web

  • DJI_0828_web

  • DJI_0839_web

  • DJI_0861_web

  • DJI_0872_web

  • DJI_0880_web

Continue reading

Bryan-Bulloch Transmission Main Phase II

Bryan-Bulloch Transmission Main
Phase II Project

Bryan-Bulloch Transmission Main Phase II

Bryan County, Georgia

The scope of work for the project included construction of a new 1,800 gallon per minute (GPM) potable water supply well in Bull County near US Highway 80. The work includes new 1,800 GPM deep Floridan Aquifer water well, wellhead piping, well building complete, electrical components, SCADA, and all necessary material, labor, and appurtenances associated with new water supply well.

  • Owner: Bryan County Board of Commissioners
  • Engineer: Thomas and Hutton
  • Project is currently in Preconstruction Phase