Skip to main content

Lowcountry RWS – Elevated Storage Tank

Lowcountry RWS – Elevated
Storage Tank Project

Lowcountry RWS – Elevated Storage Tank

The scope of work for the project included: preliminary site work necessary for the construction of the water tank; installation of valve vault and valves; yard piping; installation of drain box and drain piping; grading; paving; and fencing.

  • Owner: Lowcountry Regional Water System
  • Engineer: Thomas & Hutton
  • Estimated Completion: 2026
  • lowcountry_rws_tank

  • lowcountry_rws_tank2

Continue reading

Battery JV Metering Station

Battery JV Metering
Station Project

Battery JV Metering Station

Bryan County, Georgia

The scope of work for the project included: Construction of Metering Station Building including foundation, block, Hardie siding, trusses and roofing; installation of mechanical piping including propeller meters; yard piping; installation of HVAC; SCADA; and electrical.

  • Owner: Bryan County Board of Commissioners
  • Engineer: Thomas & Hutton
  • Estimated Completion: 2025
  • battery_jv_ms2

  • battery_jv_ms

Continue reading

Green Zone Well and Transmission Main

Green Zone Well and Trasmission
Main Project

Green Zone Well and Transmission Main

Hinesville, Georgia

The work to be performed consists of furnishing all labor and materials to complete the Green Zone Well and Transmission Main Project. More specifically, the project will consist of the installation of a large diameter Upper Floridan Well, well house, mechanical piping facilities, electrical and standby power plus 10,000 LF of 18” water transmission main.

  • Owner: City of Hinesville
  • Engineer: Simonton Engineering
  • Estimated Completion: August 2025
  • DJI_0891_web

  • DJI_0887_web

Continue reading

Bryan-Bulloch Transmission Main – Phase 3

Bryan-Bulloch Transmission
Main Phase 3

Bryan-Bulloch Transmission Main – Phase 3

Bryan County, Georgia

This project had four divisions of work. Division I involved the furnishment and installation of approximately 4,800 LF of 30–inch water main, and 1,500 LF of 16–inch water main including the directional drilling and jack and bores. Division II is the construction of a new 1,800 GPM deep Floridan Aquifer water well, wellhead piping, well building, hydropneumatic tank, electrical components, SCADA. Division III requires the installation of a five-pump booster pump station including the site work, building, piping, all electrical, SCADA, concrete, and other accessories. Division IV includes the furnishment and installation of a five-pump booster pump station and meter station along Highway 80, site work, building for the booster pump station, building for the meter station, piping, electrical, SCADA, concrete, and other accessories.

  • Owner: Bryan Co. Board of Commissioners
  • Engineer: Thomas & Hutton
  • Estimated Completion: June 2026
  • bryan-bulloch-transmission2

  • bryan-bulloch-transmission

  • DJI_0739_web

  • DJI_0749_web

  • DJI_0766_web

  • DJI_0771_web

  • DJI_0794_web

  • DJI_0818_web

  • DJI_0799_web

  • DJI_0828_web

  • DJI_0839_web

  • DJI_0861_web

  • DJI_0872_web

  • DJI_0880_web

Continue reading

Bryan-Bulloch Transmission Main Phase II

Bryan-Bulloch Transmission Main
Phase II Project

Bryan-Bulloch Transmission Main Phase II

Bryan County, Georgia

The scope of work for the project included construction of a new 1,800 gallon per minute (GPM) potable water supply well in Bull County near US Highway 80. The work includes new 1,800 GPM deep Floridan Aquifer water well, wellhead piping, well building complete, electrical components, SCADA, and all necessary material, labor, and appurtenances associated with new water supply well.

  • Owner: Bryan County Board of Commissioners
  • Engineer: Thomas and Hutton
  • Project is currently in Preconstruction Phase
  • bb-phase2-2

  • bb-phase2

  • DJI_0869_web

  • DJI_0831_web

Continue reading