Skip to main content

Wastewater Treatment Plant Upgrade – Division A

Wastewater Treatment Plant Upgrade
Division A

Wastewater Treatment Plant Upgrade – Division A

Wrightsville, Georgia

The Facility Upgrade Division A work shall be to increase the treatment capacity of the existing plant from a 0.7452 MGD Facility to a 1 MGD average monthly flow and a 3 MGD peak facility. The existing facility consists of an Aeration Pond, a Facultative Pond and a Polishing Pond. These existing ponds are proposed to remain. A new plant site is proposed approximately 900’ southeast of the existing plant headworks.

  • Owner: City of Wrightsville
  • Engineer: Ingram & Associates, LLC.
  • Estimated Completion: TBD

Let’s work together.

Contact us to find out how Southern Civil can help with your project.

Continue reading

WWTP Update and Improvements

WWTP Update and
Improvements

WWTP Update and Improvements

Folkston, Georgia

The work to be performed consists of furnishing all labor, materials, and equipment to complete the WWTP Update and Improvements. More specifically, the project will consist of clearing and grubbing, grading, dredging and cleaning of existing lagoon, granite roadway base, rock drive, asphalt paving, gravity sewer, drainage pipe and structures, electrical controls, erosion control and grassing, complete influent pump station, complete headworks, complete inline pump station, complete SBR system, complete disk filtration system, complete UV disinfection, complete reclaimed water pump station, complete sludge dewatering system, emergency power supply, transformer, and laboratory casework.

  • Owner: City of Folkston
  • Engineer: M.E. Sack Engineering
  • Estimated Completion: August 2026

Let’s work together.

Contact us to find out how Southern Civil can help with your project.

Continue reading

Reidsville WWTP Effluent Pump Station Building

Reidsville WWTP Effluent Pump
Station Building

Reidsville WWTP Effluent Pump Station Building

Reidsville, Georgia

This project consists of the demolition and replacement of 4 Effluent Vertical Turbine Pumps, the demolition of the current effluent pump station building and the construction of a new effluent pump station building, including the mechanical piping and building control equipment.

  • Owner: City of Reidsville
  • General Contractor: McClendon Enterprises
  • Estimated Completion: TBD

Let’s work together.

Contact us to find out how Southern Civil can help with your project.

Continue reading

Statesboro Wastewater Treatment Plant Blower Upgrades

Statesboro Wastewater
Treatment Plant
Blower Upgrades

Statesboro Wastewater Treatment Plant Blower Upgrades

Statesboro, Georgia

Installation of Two additional aeration basin blowers, bypass pumping system, electrical and instrumentation, piping, and related work and materials for modifications to the existing blower room and aeration basins at the Statesboro Wastewater Treatment Plant as shown in the plans and bid documents.

  • Owner: City of Statesboro
  • Engineer: Hussey Gay Bell
  • Estimated Completion: October 2025

Let’s work together.

Contact us to find out how Southern Civil can help with your project.

Continue reading

Sewerage System Improvements for City of Nahunta

Sewerage System Improvements
for Nahunta Project

Sewerage System Improvements for City of Nahunta

Nahunta, Georgia

The scope of work for this project included additions to the water pollution control plant to include construction of a screen and grit structure, a treatment plant complete with two trains of aeration basins, clarifiers and digesters, blowers, tertiary filters, ultraviolet disinfection system, a plant pump station, effluent pump station, sludge dewatering containers, control building, and blower building all complete with appurtenances.

  • Owner: City of Nahunta
  • Engineer: Turnipseed Engineers
  • Estimated Completion: April 2025
  • nahunta_5

  • nahunta_4

  • nahunta_3

  • nahunta_2

  • nahunta_1

  • nahunta1

  • nahunta2

  • nahunta3

  • nahunta4

  • nahunta5

  • nahunta6

  • nahunta7

  • nahunta8

  • nahunta9

  • nahunta10

  • nahunta11

  • nahunta12

  • nahunta13

Let’s work together.

Contact us to find out how Southern Civil can help with your project.

Continue reading

Hinesville Water Reclamation Facility Modifications

Hinesville Water
Reclamation Facility
Modifications
Project

Hinesville Water Reclamation Facility Modifications

Hinesville, Georgia

The scope of work for the project included: grading and paving a new on-site road with 1200 SY of granite roadway base and 264 tons of asphalt paving, drainage improvements, installation of new conduit with fiber optics and power cables, modifications to an existing blower building, installing valves, flow meters and stainless steel air pipe, fittings and expansion joints, relocating removal of digester equipment and installation of sequencing batch reactor equipment in an existing concrete basin, construction of 58’ diameter prestressed concrete basin and installation of all necessary piping and digester equipment, modifications to existing belt press building, and replacing existing grit and odor control systems.

  • Owner: City of Hinesville
  • Engineer: Simonton Engineering
  • Estimated Completion: 2023
  • hinesville-wwtp2

  • hinesville-wwtp

  • hinesville-DJI_0573

  • hinesville-123

  • hinesville_wrf1

  • hinesville_wrf2

  • hinesville_wrf3

  • hinesville_wrf4

  • hinesville_wrf5

Let’s work together.

Contact us to find out how Southern Civil can help with your project.

Continue reading