WPCP Clarifier Replacement

WPCP Clarifier Replacement
Project

WPCP Clarifier Replacement

Garden City, Georgia

The scope of work for the project included replacement of equipment for two 35-foot diameter clarifiers including demolition, removal and proper disposal of existing clarifier equipment and sludge removal. Procurement and installation of new clarifier equipment and associated electrical as required.

  • Owner: City of Garden City
  • Engineer: Brennan Jones Engineering Associates, LLC
  • Estimated Completion: July 2024

Let’s work together.

Contact us to find out how Southern Civil can help with your project.

Continue reading

Sewerage System Improvements for City of Nahunta

Sewerage System Improvements
for Nahunta Project

Sewerage System Improvements for City of Nahunta

Nahunta, Georgia

The scope of work for this project included additions to the water pollution control plant to include construction of a screen and grit structure, a treatment plant complete with two trains of aeration basins, clarifiers and digesters, blowers, tertiary filters, ultraviolet disinfection system, a plant pump station, effluent pump station, sludge dewatering containers, control building, and blower building all complete with appurtenances.

  • Owner: City of Nahunta
  • Engineer: Turnipseed Engineers
  • Estimated Completion: April 2025
  • nahunta_5

  • nahunta_4

  • nahunta_3

  • nahunta_2

  • nahunta_1

  • nahunta

Let’s work together.

Contact us to find out how Southern Civil can help with your project.

Continue reading

Hinesville Water Reclamation Facility Modifications

Hinesville Water
Reclamation Facility
Modifications
Project

Hinesville Water Reclamation Facility Modifications

Hinesville, Georgia

The scope of work for the project included: grading and paving a new on-site road with 1200 SY of granite roadway base and 264 tons of asphalt paving, drainage improvements, installation of new conduit with fiber optics and power cables, modifications to an existing blower building, installing valves, flow meters and stainless steel air pipe, fittings and expansion joints, relocating removal of digester equipment and installation of sequencing batch reactor equipment in an existing concrete basin, construction of 58’ diameter prestressed concrete basin and installation of all necessary piping and digester equipment, modifications to existing belt press building, and replacing existing grit and odor control systems.

  • Owner: City of Hinesville
  • Engineer: Simonton Engineering
  • Estimated Completion: 2023
  • hinesville-wwtp2

  • hinesville-wwtp

  • hinesville-DJI_0573

  • hinesville-123

Let’s work together.

Contact us to find out how Southern Civil can help with your project.

Continue reading