Skip to main content

Hinesville WWTP CMAR

Hinesville
CMAR WWTP Project

Hinesville CMAR Wastewater Treatment Plant

Hinesville, Georgia

This project consisted of the expansion and upgrade of the existing Water Reclamation Facility from 2.0 MGD to 4.0 MGD, along with the installation of approximately 20,000 LF of 24-inch force main through Fort Stewart to the Taylors Creek discharge pipe. Work included replacement of the existing headworks, installation of new SBR equipment within the existing tankage, construction of a parallel cloth filter system, upgrades to the UV disinfection system, and installation of multiple pumping stations to support the expanded capacity.

  • Owner: City of Hinesville
  • Engineer: Simonton Engineering
  • Estimated Completion: TBD

Continue reading

Pembroke Wastewater Treatment Plant

Pembroke
WWTP Project

Pembroke Wastewater Treatment Plant

Pembroke, Georgia

The scope of work for the project included: Construction of a new screen and grit structure; expansion of the water pollution control plant including an aeration basin, clarifier, digester, blowers, filters, UV disinfection system, and dewatering system; construction of a control building; and installation of associated electrical systems.

  • Owner: City of Pembroke
  • Engineer: M.E. Sack Engineering
  • Estimated Completion: 2027
  • Pembroke-main

  • Pembroke-2

  • Pembroke-WWTP

Continue reading

Folkston Wastewater Treatment Plant

Folkston
WWTP Project

Folkston Wastewater Treatment Plant

Folkston, Georgia

The scope of work for the project included: Grading, dredging, and cleaning of the reject pond; construction of concrete driveways; installation of drainage pipes and structures; selective demolition; installation of electrical controls; erosion control and grassing; installation of a manual filter screen; construction of an influent pump station; installation of an SBR system; installation of a disk filtration system; installation of UV disinfection; construction of a reject pump station; installation of a sludge dewatering system; installation of an emergency power supply; and installation of a transformer.

  • Owner: City of Folkston
  • Engineer: M.E. Sack Engineering
  • Estimated Completion: 2027
  • Folkston-Main

  • Folkston

  • Folkston-2

Continue reading

Wastewater Treatment Plant Upgrade – Division A

Wastewater Treatment Plant Upgrade
Division A

Wastewater Treatment Plant Upgrade – Division A

Wrightsville, Georgia

The Facility Upgrade Division A work shall be to increase the treatment capacity of the existing plant from a 0.7452 MGD Facility to a 1 MGD average monthly flow and a 3 MGD peak facility. The existing facility consists of an Aeration Pond, a Facultative Pond and a Polishing Pond. These existing ponds are proposed to remain. A new plant site is proposed approximately 900’ southeast of the existing plant headworks.

  • Owner: City of Wrightsville
  • Engineer: Ingram & Associates, LLC.
  • Estimated Completion: TBD
  • wrightsville_wwtp3

  • wrightsville_wwtp2

  • wrightsville_wwtp

Continue reading

Statesboro Wastewater Treatment Plant Blower Upgrades

Statesboro Wastewater
Treatment Plant
Blower Upgrades

Statesboro Wastewater Treatment Plant Blower Upgrades

Statesboro, Georgia

Installation of Two additional aeration basin blowers, bypass pumping system, electrical and instrumentation, piping, and related work and materials for modifications to the existing blower room and aeration basins at the Statesboro Wastewater Treatment Plant as shown in the plans and bid documents.

  • Owner: City of Statesboro
  • Engineer: Hussey Gay Bell
  • Estimated Completion: October 2025
  • statesboro_wwtp2

  • statesboro_wwtp

Continue reading

Sewerage System Improvements for City of Nahunta

Sewerage System Improvements
for Nahunta Project

Sewerage System Improvements for City of Nahunta

Nahunta, Georgia

The scope of work for this project included additions to the water pollution control plant to include construction of a screen and grit structure, a treatment plant complete with two trains of aeration basins, clarifiers and digesters, blowers, tertiary filters, ultraviolet disinfection system, a plant pump station, effluent pump station, sludge dewatering containers, control building, and blower building all complete with appurtenances.

  • Owner: City of Nahunta
  • Engineer: Turnipseed Engineers
  • Estimated Completion: April 2025
  • nahunta_5

  • nahunta_4

  • nahunta_3

  • nahunta_2

  • nahunta_1

  • nahunta1

  • nahunta2

  • nahunta3

  • nahunta4

  • nahunta5

  • nahunta6

  • nahunta7

  • nahunta8

  • nahunta9

  • nahunta10

  • nahunta11

  • nahunta12

  • nahunta13

  • IMG_1598_web

  • IMG_1674_web

  • IMG_1680_web

  • IMG_1681_web

  • IMG_1762_web

  • IMG_1802_web

  • IMG_1803_web

Continue reading