Mount Vernon Well House Improvements

Mount Vernon Well
House Project

Mount Vernon Well House Improvements

Mount Vernon, Georgia

The scope of work for the project included: demolition of existing Well House #2; construction of new Well House #2, mechanical piping for new well house; site improvements; gravel paving; fencing; electrical and SCADA installation, construction of addition to Well House #1, mechanical piping; electrical and SCADA upgrades.

  • Owner: City of Mount Vernon
  • Engineer: Turnipseed Engineers
  • Estimated Completion: August 2024
  • mount_vernon_1

  • mount_vernon_2

  • Mount_Vernon

  • mount_vernon_4

  • mount_vernon_3

  • mount_vernon_5

Let’s work together.

Contact us to find out how Southern Civil can help with your project.

Continue reading

WPCP Clarifier Replacement

WPCP Clarifier Replacement
Project

WPCP Clarifier Replacement

Garden City, Georgia

The scope of work for the project included replacement of equipment for two 35-foot diameter clarifiers including demolition, removal and proper disposal of existing clarifier equipment and sludge removal. Procurement and installation of new clarifier equipment and associated electrical as required.

  • Owner: City of Garden City
  • Engineer: Brennan Jones Engineering Associates, LLC
  • Estimated Completion: July 2024

Let’s work together.

Contact us to find out how Southern Civil can help with your project.

Continue reading

Sewerage System Improvements for City of Nahunta

Sewerage System Improvements
for Nahunta Project

Sewerage System Improvements for City of Nahunta

Nahunta, Georgia

The scope of work for this project included additions to the water pollution control plant to include construction of a screen and grit structure, a treatment plant complete with two trains of aeration basins, clarifiers and digesters, blowers, tertiary filters, ultraviolet disinfection system, a plant pump station, effluent pump station, sludge dewatering containers, control building, and blower building all complete with appurtenances.

  • Owner: City of Nahunta
  • Engineer: Turnipseed Engineers
  • Estimated Completion: April 2025
  • nahunta_5

  • nahunta_4

  • nahunta_3

  • nahunta_2

  • nahunta_1

  • nahunta

Let’s work together.

Contact us to find out how Southern Civil can help with your project.

Continue reading

Bryan-Bulloch Transmission Main Phase II

Bryan-Bulloch Transmission Main
Phase II Project

Bryan-Bulloch Transmission Main Phase II

Bryan County, Georgia

The scope of work for the project included construction of a new 1,800 gallon per minute (GPM) potable water supply well in Bull County near US Highway 80. The work includes new 1,800 GPM deep Floridan Aquifer water well, wellhead piping, well building complete, electrical components, SCADA, and all necessary material, labor, and appurtenances associated with new water supply well.

  • Owner: Bryan County Board of Commissioners
  • Engineer: Thomas and Hutton
  • Project is currently in Preconstruction Phase

Let’s work together.

Contact us to find out how Southern Civil can help with your project.

Continue reading

SEDA Manufacturing Center 0.6 MG Elevated Storage Tank

SEDA 0.6 MG
Tank Project

SEDA Manufacturing Center 0.6 MG Elevated Storage Tank

Savannah, Georgia

The scope of work for the project included: preliminary site work necessary for the construction of the water tank; installation of valve vault and valves; yard piping; installation of drain box and drain piping; grading; paving; and fencing.

  • Owner: Savannah Economic Development Authority
  • Engineer: Hussey Gay Bell
  • Estimated Completion: 2024
  • SEDA-tank2

  • SEDA-Tank

Let’s work together.

Contact us to find out how Southern Civil can help with your project.

Continue reading

HMGMA Civil Works Package 2

HMGMA Civil Works
Package 2 Project

Hyundai Motor Group Metaplant America Civil Works Package 2

Ellabell, Georgia

The scope of work for the project included the installation of the gravity sewer system for the Hyundai Motor Group Metaplant America Project. This project also included the installation of two pre-built fiberglass pump stations as a part of the same sewer system.

  • Owner: Hyundai Motor Group
  • Engineer: Hyundai Engineering America
  • Estimated Completion: 2024
  • HMGMA

  • HMGMA2

  • HMGMA5

  • HMGMA-civil-works3

  • HMGMA-civil-works2

  • HMGMA-civil-works

Let’s work together.

Contact us to find out how Southern Civil can help with your project.

Continue reading

BCMS Regional Pump Station

BCMS Regional Pump
Station Project

BCMS Regional Pump Station

Bryan County, Georgia

The scope of work for the project included: construction of a temporary pump station, complete with pump package, mechanical piping, and electrical; excavation, shoring and dewatering for cast-in-place concrete wet well; construction of cast-in-place wet well; wet well interior coating; provide and install submersible pump and control package; mechanical piping; provide and install generator and ATS; electrical upgrades; removal of temporary pump station; site gravel paving and fencing.

  • Owner: Bryan Co. Board of Commissioners
  • Engineer: Thomas & Hutton
  • Estimated Completion: 2024
  • bcms_pump_station4

  • bcms_pump_station3

  • bcms_pump_station2

  • BCMS-LS

  • BCMS-LS2

  • BCMS-LS3

  • BCMS-LS-DJI_0450

  • BCMS-LS-DJI_0495

  • BCMS-LS-DJI_0553

  • BCMS-LS-DJI_0575

  • BCMS-LS-DJI_0598

Let’s work together.

Contact us to find out how Southern Civil can help with your project.

Continue reading

BCMS Tank & Well

BCMS Tank &
Well Project

BCMS Tank & Well

Bryan County, Georgia

The scope of work for the project included: preliminary site work necessary for the construction of the water tank; drilling 1,800 GPM Floridian Well; construction of new well house; mechanical piping for well house; yard piping; tank interior mechanical piping; installation of new generator and automatic transfer switch; gravel paving; landscaping; fencing.

  • Owner: Bryan Co. Board of Commissioners
  • Engineer: Thomas & Hutton
  • Estimated Completion: 2024
  • bcms-tank4

  • bcms_tank_well

  • bcms_tank_well2

  • bcms_tank_well3

  • BCMS-tank-DJI_0586

  • BCMS-tank-DJI_0592

  • BCMS-Tank-Well1

  • BCMS-Tank-Well2

  • BCMS-Tank-Well3

Let’s work together.

Contact us to find out how Southern Civil can help with your project.

Continue reading

Hinesville Water Reclamation Facility Modifications

Hinesville Water
Reclamation Facility
Modifications
Project

Hinesville Water Reclamation Facility Modifications

Hinesville, Georgia

The scope of work for the project included: grading and paving a new on-site road with 1200 SY of granite roadway base and 264 tons of asphalt paving, drainage improvements, installation of new conduit with fiber optics and power cables, modifications to an existing blower building, installing valves, flow meters and stainless steel air pipe, fittings and expansion joints, relocating removal of digester equipment and installation of sequencing batch reactor equipment in an existing concrete basin, construction of 58’ diameter prestressed concrete basin and installation of all necessary piping and digester equipment, modifications to existing belt press building, and replacing existing grit and odor control systems.

  • Owner: City of Hinesville
  • Engineer: Simonton Engineering
  • Estimated Completion: 2023
  • hinesville-wwtp2

  • hinesville-wwtp

  • hinesville-DJI_0573

  • hinesville-123

Let’s work together.

Contact us to find out how Southern Civil can help with your project.

Continue reading

Hodgeville Lift Station #4 Improvements

Hodgeville Lift Station #4
Improvements Project

Hodgeville Lift Station #4 Improvements

Guyton, Georgia

The scope of work for the project included: construction of new wet well; purchase and installation of pump package, odor control unit, diesel bypass pumping system; construction of raised electrical control building; site paving; electrical and SCADA improvements; associated force main and gravity sewer piping; jack and bore installation and connections; demolition; installation of additional auxiliary equipment required for an operable station.

  • Owner: Effingham Co. Board of Commissioners
  • Engineer: Hussey Gay Bell
  • Estimated Completion: August 2023
  • hodgeville-ls

  • hodgeville-lift-station

  • hodgeville-ls-3

  • Hodgeville-LS2

  • Hodgeville-LS3

  • Hodgeville-Tie-in4

Let’s work together.

Contact us to find out how Southern Civil can help with your project.

Continue reading