Hazlehurst Well

Hazlehurst
Well Project

Hazlehurst Well

Hazlehurst, Georgia

The scope of work for the project included: construction of a 1,000 GPM potable water well approximately 900 feet, construction of a new well house; mechanical piping; chemical feed systems; 625’ of 12” water line; electrical and SCADA installation.

  • Owner: City of Hazlehurst
  • Engineer: Turnipseed Engineers
  • Completed: December 2022
  • hazlehurst_well1

  • hazlehurst_well2

  • hazlehurst_well3

Continue reading

SEDA Master Lift Station

SEDA Master Lift
Station Project

SEDA Master Lift Station

Savannah, Georgia

Scope of work on this project included: installation of the flow meter vault, plug valve manhole, and the air release valve manhole; installation of the generator and control panel maintenance pads; pump station mechanical piping; yard piping; installation of submersible pumps; Raven 405 Epoxy Coating on wet well and site manholes; installation of chain-link fencing; gravel paving.

  • Owner: Savannah Economic Development Authority
  • Engineer: Hussey Gay Bell
  • Completed: August 2020
  • seda_ls1

  • seda_ls2

  • seda_ls4

  • seda_ls6

  • seda_ls5

Continue reading

Springfield Pump Station Crane

Springfield Pump Station
Crane Project

Springfield Pump Station Crane

Savannah, Georgia

The scope of work for the project included: construction of pile supported steel support columns; installation of 15-foot rail beam extension; extension of hoist track; electrical upgrades; construction of protecting bollards.

  • Owner: City of Savannah
  • Engineer: Collins Engineers, Inc.
  • Completed: August 2021
  • springfield_ps_crane1

  • springfield_ps_crane2

Continue reading

Southeast Quadrant SWDI

Southeast Quadrant
SWDI Project

Southeast Quadrant SWDI

Savannah, Georgia

The Scope of work for this project included: the construction of pipe culvert concrete end wall with Fabriform revetment and security bar grating for triple 48” RCP; the construction of two pipe culvert concrete end walls with Fabriform revetment and security bar grating for triple 60” RCP; the construction of a 14’x20’ concrete junction box with cover; the construction of a 18’x18’ concrete junction box with cover.

  • Owner: Savannah-Hilton Head International Airport
  • Engineer: Coleman Company
  • Completed: September 2022
  • sc_southeast_quad2

  • sc_southeast_quad4

  • sc_southeast_quad3

Continue reading

Savannah Quarters Lift Station

Savannah Quarters
Lift Station Project

Savannah Quarters Lift Station

Pooler, Georgia

The scope of the project included Master Lift Station with three 79.1 hp submersible pumps, 7,440 LF of 18” PVC force main installed by open cut, 1,007 LF of 18” RJ PVC force main installed by open cut, 4,776 LF of 18” FPVC force main installed by horizontal directional drill,1,493 LF of 18” FPVC force main installed in 24” FPVC casing by horizontal directional drill, and 110 LF of 18” FPVC force main installed in 24” steel casing by jack and bore.

  • Owner: City of Pooler
  • Engineer: Hussey Gay Bell
  • Completed: June 2023
  • ps_savannah2

  • ps_savannah3

  • ps_savannah4

  • ps_savannah5

Continue reading

BGJWSC Pump Station 4116

BGJWSC Pump Station
4116 Project

Brunswick-Glynn County Joint Water & Sewer Commission Pump Station 4116

Brunswick, Georgia

The scope of the project included: new precast concrete wet well with aluminum access covers; pumping equipment and accessories; discharge piping, valves, effluent flow meter; 6” PVC force main with associated fittings and appurtenances; new electrical shed and SCADA components; erosion and sedimentation controls; security fencing and related site work.

  • Owner: Brunswick-Glynn County Joint Water & Sewer Commission
  • Engineer: Brunswick-Glynn County Joint Water & Sewer Commission
  • Completed: January 2022
  • ps_bgjwsc2

  • ps_bgjwsc3

  • ps_bgjwsc4

  • ps_bgjwsc5

Continue reading

President Street SRL Pump Station

President St
SRL Project

President Street SRL Pump Station

Savannah, Georgia

The scope of the project involved: construction of 24” concrete pile cap to support buried structures; installation of 20,000-gallon wet well; installation of valve vault; installation of ARV structure; installation of collection manhole; Raven 405 High Build Epoxy Coating for all buried structures; 24” gravity sewer between wet well and collection manhole, installation of generator set; installation of duplex pump package; mechanical and site piping for the pump station site; electrical and SCADA package.

  • Owner: City of Savannah
  • Engineer: Thomas & Hutton
  • Completed: November 2020
  • ps_pres_st2

  • ps_pres_st1

Continue reading

Harris C Hinley WRF Phase II Upgrades

Harris Hinley
Project

Harris C. Hinley WRF Phase II Upgrades

Springfield, Georgia

The scope of work for this project included demolition and removal of existing piping and appurtenant structures for two existing clarifiers; addition of a new secondary clarifier; construction of new piping and appurtenant structures for the new and existing clarifiers; demolition and removal of existing outfall section; addition of new outfall piping and appurtenant structures; construction of new miscellaneous pipe connections to new parts of the work; demolition, removal, and replacement of surface site features around construction areas; addition of a new sludge flow measurement system; addition of a new SCADA system. The work was completed while keeping the facility in full operation.

  • Owner: City of Springfield
  • Engineer: Integrated Science and Engineering
  • Competed: January 2023
  • wwtp_hh3

  • wwtp_hh4

  • wwtp_hh1

Continue reading

Golden Isles Marina WWTP

Golden Isles Marina
WWTP Project

Golden Isles Marina Wastewater Treatment Plant

St Simons Island, Georgia

The scope of work for the project included: complete demolition and removal of existing plant; installation of new Pro-Water Wastewater Package Plant 30k gallons per day & Trojan UV disinfection Equipment; S.O.G. concrete equipment pad; yard piping; removal and disposal of existing solids; transfer of existing plant fluid & sludge; electrical connections.

  • Owner: Golden Isles Marina Master Association
  • Completion Date: July 2022
  • wwtp_cbw1

  • wwtp_cbw3

Continue reading

Charlie Butler Well

Charlie Butler
Well Project

Charlie Butler Well

Midway, Georgia

The scope of work for the project included: erosion control measures; the construction of a new Floridian well; installation of well pump; construction of a well house; well house mechanical piping; site piping; installation of emergency generator, electrical installation; fencing; site paving.

  • Owner: City of Midway
  • Engineer: T.R. Long Engineering
  • Estimated Completion: August 2023
  • wwtp_cbw1

  • wwtp_cbw3

  • wwtp_cbw4