The scope of the project encompassed: site grubbing, clearing and improvements; erosion and sedimentation controls; modifications to existing well, piping and flow meter; construction of a pre-stressed concrete ground storage tank with aerator and level controls; installation of tank drains, yard piping and connections; construction of pump building with high service pumps, piping, control and electrical system, chemical feed equipment, multi-site SCADA and ancillary equipment; demolition of existing structures and equipment.
- Owner: Brunswick-Glynn County Joint Water and Sewer Commission
- Engineer: Elmo A Richardson. JR., PE., LLC
- Completed: January 2021
-