Mobis and OEM Metering Station

Mobis and OEM Metering
Station Project

Mobis and OEM Metering Station

Bryan County, Georgia

The scope of work for the project included: Construction of Metering Station Building including foundation, block, Hardie siding, trusses and roofing; installation of mechanical piping including propeller meters; yard piping; installation of HVAC; SCADA; and electrical.

  • Owner: Bryan County Board of Commissioners
  • Engineer: Thomas & Hutton
  • Estimated Completion: 2025

Continue reading

Lowcountry RWS – Elevated Storage Tank

Lowcountry RWS – Elevated
Storage Tank Project

Lowcountry RWS – Elevated Storage Tank

The scope of work for the project included: preliminary site work necessary for the construction of the water tank; installation of valve vault and valves; yard piping; installation of drain box and drain piping; grading; paving; and fencing.

  • Owner: Lowcountry Regional Water System
  • Engineer: Thomas & Hutton
  • Estimated Completion: 2026
  • lowcountry_rws_tank

  • lowcountry_rws_tank2

Continue reading

Battery JV Metering Station

Battery JV Metering
Station Project

Battery JV Metering Station

Bryan County, Georgia

The scope of work for the project included: Construction of Metering Station Building including foundation, block, Hardie siding, trusses and roofing; installation of mechanical piping including propeller meters; yard piping; installation of HVAC; SCADA; and electrical.

  • Owner: Bryan County Board of Commissioners
  • Engineer: Thomas & Hutton
  • Estimated Completion: 2025
  • battery_jv_ms2

  • battery_jv_ms

Continue reading

Green Zone Well and Transmission Main

Green Zone Well and Trasmission
Main Project

Green Zone Well and Transmission Main

Hinesville, Georgia

The work to be performed consists of furnishing all labor and materials to complete the Green Zone Well and Transmission Main Project. More specifically, the project will consist of the installation of a large diameter Upper Floridan Well, well house, mechanical piping facilities, electrical and standby power plus 10,000 LF of 18” water transmission main.

  • Owner: City of Hinesville
  • Engineer: Simonton Engineering
  • Estimated Completion: August 2025
  • DJI_0891_web

  • DJI_0887_web

Continue reading

Ford Ave Elevated Storage Tank – Altitude Valve

Ford Ave Elevated Storage Tank
Altitude Valve

Ford Ave Elevated Storage Tank – Altitude Valve

Richmond Hill, Georgia

The scope of work on this project includes: the construction of an altitude valve assembly, including associated isolation and check valves, piping and vault. This project also required the installation of an 80 gallon per minute booster package pump system, including electrical, SCADA, and all necessary appurtenances associated with the construction of the altitude valve and pump station as required to tie into the existing water and SCADA system.

  • Owner: City of Richmond Hill
  • Engineer: Thomas & Hutton
  • Estimated Completion: April 2025

Continue reading

Mount Vernon Well House Improvements

Mount Vernon Well
House Project

Mount Vernon Well House Improvements

Mount Vernon, Georgia

The scope of work for the project included: demolition of existing Well House #2; construction of new Well House #2, mechanical piping for new well house; site improvements; gravel paving; fencing; electrical and SCADA installation, construction of addition to Well House #1, mechanical piping; electrical and SCADA upgrades.

  • Owner: City of Mount Vernon
  • Engineer: Turnipseed Engineers
  • Estimated Completion: August 2024
  • mount_vernon_1

  • mount_vernon_2

  • Mount_Vernon

  • mount_vernon_4

  • mount_vernon_3

  • mount_vernon_5

Continue reading

SEDA Manufacturing Center 0.6 MG Elevated Storage Tank

SEDA 0.6 MG
Tank Project

SEDA Manufacturing Center 0.6 MG Elevated Storage Tank

Savannah, Georgia

The scope of work for the project included: preliminary site work necessary for the construction of the water tank; installation of valve vault and valves; yard piping; installation of drain box and drain piping; grading; paving; and fencing.

  • Owner: Savannah Economic Development Authority
  • Engineer: Hussey Gay Bell
  • Estimated Completion: 2024
  • SEDA-tank2

  • SEDA-Tank

  • seda1

  • seda2

  • seda3

  • seda4

  • seda_DJI_0849_web

  • seda_DJI_0853_web

Continue reading

BCMS Tank & Well

BCMS Tank &
Well Project

BCMS Tank & Well

Bryan County, Georgia

The scope of work for the project included: preliminary site work necessary for the construction of the water tank; drilling 1,800 GPM Floridian Well; construction of new well house; mechanical piping for well house; yard piping; tank interior mechanical piping; installation of new generator and automatic transfer switch; gravel paving; landscaping; fencing.

  • Owner: Bryan Co. Board of Commissioners
  • Engineer: Thomas & Hutton
  • Estimated Completion: 2024
  • bcms-tank4

  • bcms_tank_well

  • bcms_tank_well2

  • bcms_tank_well3

  • BCMS-tank-DJI_0586

  • BCMS-tank-DJI_0592

  • BCMS-Tank-Well1

  • BCMS-Tank-Well2

  • BCMS-Tank-Well3

  • bcms_tw4

  • bcms_tw2

  • bcms_tw1

Continue reading

Ridgewood Water Production Facility

Ridgewood Water Production
Facility Project

Ridgewood Water Production Facility

Brunswick, Georgia

The scope of the project encompassed: site grubbing, clearing and improvements; erosion and sedimentation controls; modifications to existing well, piping and flow meter; construction of a pre-stressed concrete ground storage tank with aerator and level controls; installation of tank drains, yard piping and connections; construction of pump building with high service pumps, piping, control and electrical system, chemical feed equipment, multi-site SCADA and ancillary equipment; demolition of existing structures and equipment.

  • Owner: Brunswick-Glynn County Joint Water and Sewer Commission
  • Engineer: Elmo A Richardson. JR., PE., LLC
  • Completed: January 2021
  • ridgewood_wpf1

  • ridgewood_wpf2

  • ridgewood_wpf3

  • ridgewood_wpf4

Continue reading

Jesup Well #6

Jesup Well
No. 6 Project

Jesup Well No. 6

Jesup, Georgia

The project scope of work included: 1,600 GPM Floridian well; construction of a new pump house; installation of a 10,000-gallon mixing tank; water distribution piping, sanitary sewer piping; new chemical feed equipment; process controls; SCADA and electrical upgrades.

  • Owner: City of Jesup
  • Engineer: T.R. Long Engineering
  • Completed: January 2020
  • jesup_well2

  • jesup_well3

Continue reading