Skip to main content

Mobis and OEM Metering Station

Mobis and OEM Metering
Station Project

Mobis and OEM Metering Station

Bryan County, Georgia

The scope of work for the project included: Construction of Metering Station Building including foundation, block, Hardie siding, trusses and roofing; installation of mechanical piping including propeller meters; yard piping; installation of HVAC; SCADA; and electrical.

  • Owner: Bryan County Board of Commissioners
  • Engineer: Thomas & Hutton
  • Estimated Completion: 2025

Continue reading

Ford Ave Elevated Storage Tank – Altitude Valve

Ford Ave Elevated Storage Tank
Altitude Valve

Ford Ave Elevated Storage Tank – Altitude Valve

Richmond Hill, Georgia

The scope of work on this project includes: the construction of an altitude valve assembly, including associated isolation and check valves, piping and vault. This project also required the installation of an 80 gallon per minute booster package pump system, including electrical, SCADA, and all necessary appurtenances associated with the construction of the altitude valve and pump station as required to tie into the existing water and SCADA system.

  • Owner: City of Richmond Hill
  • Engineer: Thomas & Hutton
  • Estimated Completion: April 2025

Continue reading

Mount Vernon Well House Improvements

Mount Vernon Well
House Project

Mount Vernon Well House Improvements

Mount Vernon, Georgia

The scope of work for the project included: demolition of existing Well House #2; construction of new Well House #2, mechanical piping for new well house; site improvements; gravel paving; fencing; electrical and SCADA installation, construction of addition to Well House #1, mechanical piping; electrical and SCADA upgrades.

  • Owner: City of Mount Vernon
  • Engineer: Turnipseed Engineers
  • Estimated Completion: August 2024
  • mount_vernon_1

  • mount_vernon_2

  • Mount_Vernon

  • mount_vernon_4

  • mount_vernon_3

  • mount_vernon_5

Continue reading

SEDA Manufacturing Center 0.6 MG Elevated Storage Tank

SEDA 0.6 MG
Tank Project

SEDA Manufacturing Center 0.6 MG Elevated Storage Tank

Savannah, Georgia

The scope of work for the project included: preliminary site work necessary for the construction of the water tank; installation of valve vault and valves; yard piping; installation of drain box and drain piping; grading; paving; and fencing.

  • Owner: Savannah Economic Development Authority
  • Engineer: Hussey Gay Bell
  • Estimated Completion: 2024
  • SEDA-tank2

  • SEDA-Tank

  • seda1

  • seda2

  • seda3

  • seda4

  • seda_DJI_0849_web

  • seda_DJI_0853_web

Continue reading

BCMS Tank & Well

BCMS Tank &
Well Project

BCMS Tank & Well

Bryan County, Georgia

The scope of work for the project included: preliminary site work necessary for the construction of the water tank; drilling 1,800 GPM Floridian Well; construction of new well house; mechanical piping for well house; yard piping; tank interior mechanical piping; installation of new generator and automatic transfer switch; gravel paving; landscaping; fencing.

  • Owner: Bryan Co. Board of Commissioners
  • Engineer: Thomas & Hutton
  • Estimated Completion: 2024
  • bcms-tank4

  • bcms_tank_well

  • bcms_tank_well2

  • bcms_tank_well3

  • BCMS-tank-DJI_0586

  • BCMS-tank-DJI_0592

  • BCMS-Tank-Well1

  • BCMS-Tank-Well2

  • BCMS-Tank-Well3

  • bcms_tw4

  • bcms_tw2

  • bcms_tw1

Continue reading

Ridgewood Water Production Facility

Ridgewood Water Production
Facility Project

Ridgewood Water Production Facility

Brunswick, Georgia

The scope of the project encompassed: site grubbing, clearing and improvements; erosion and sedimentation controls; modifications to existing well, piping and flow meter; construction of a pre-stressed concrete ground storage tank with aerator and level controls; installation of tank drains, yard piping and connections; construction of pump building with high service pumps, piping, control and electrical system, chemical feed equipment, multi-site SCADA and ancillary equipment; demolition of existing structures and equipment.

  • Owner: Brunswick-Glynn County Joint Water and Sewer Commission
  • Engineer: Elmo A Richardson. JR., PE., LLC
  • Completed: January 2021
  • ridgewood_wpf1

  • ridgewood_wpf2

  • ridgewood_wpf3

  • ridgewood_wpf4

Continue reading

Jesup Well #6

Jesup Well
No. 6 Project

Jesup Well No. 6

Jesup, Georgia

The project scope of work included: 1,600 GPM Floridian well; construction of a new pump house; installation of a 10,000-gallon mixing tank; water distribution piping, sanitary sewer piping; new chemical feed equipment; process controls; SCADA and electrical upgrades.

  • Owner: City of Jesup
  • Engineer: T.R. Long Engineering
  • Completed: January 2020
  • jesup_well2

  • jesup_well3

Continue reading

Hazlehurst Well

Hazlehurst
Well Project

Hazlehurst Well

Hazlehurst, Georgia

The scope of work for the project included: construction of a 1,000 GPM potable water well approximately 900 feet, construction of a new well house; mechanical piping; chemical feed systems; 625’ of 12” water line; electrical and SCADA installation.

  • Owner: City of Hazlehurst
  • Engineer: Turnipseed Engineers
  • Completed: December 2022
  • hazlehurst_well1

  • hazlehurst_well2

  • hazlehurst_well3

Continue reading

Charlie Butler Well

Charlie Butler
Well Project

Charlie Butler Well

Midway, Georgia

The scope of work for the project included: erosion control measures; the construction of a new Floridian well; installation of well pump; construction of a well house; well house mechanical piping; site piping; installation of emergency generator, electrical installation; fencing; site paving.

  • Owner: City of Midway
  • Engineer: T.R. Long Engineering
  • Estimated Completion: August 2023
  • wwtp_cbw1

  • wwtp_cbw3

  • wwtp_cbw4

Continue reading