I-16 Regional Water and Sewer Improvements

I-16 Regional Water
and Sewer
Improvements
Project

I-16 Regional Water and Sewer Improvements

Bryan County, Georgia

The scope of work for the project included: dewatering, shoring, and excavation required to install buried structures; installation of a 12’x12’ wet well; three plug valve manholes; 6’ collection manhole; Raven 405 Epoxy Coating of all buried structures; installation of Duplex submersible pump package; mechanical and yard piping; construction of maintenance pads; installation of generator/ATS; installation of site electrical package; site improvements.

  • Owner: Bryan County Board of Commissioners
  • Engineer: Thomas and Hutton
  • Estimated Completion: August 2023
  • 1-16-pump-2

  • deep_excavation_dji_fly

  • deep-excavation_dji

Let’s work together.

Contact us to find out how Southern Civil can help with your project.

Continue reading

Ridgewood Water Production Facility

Ridgewood Water Production
Facility Project

Ridgewood Water Production Facility

Brunswick, Georgia

The scope of the project encompassed: site grubbing, clearing and improvements; erosion and sedimentation controls; modifications to existing well, piping and flow meter; construction of a pre-stressed concrete ground storage tank with aerator and level controls; installation of tank drains, yard piping and connections; construction of pump building with high service pumps, piping, control and electrical system, chemical feed equipment, multi-site SCADA and ancillary equipment; demolition of existing structures and equipment.

  • Owner: Brunswick-Glynn County Joint Water and Sewer Commission
  • Engineer: Elmo A Richardson. JR., PE., LLC
  • Completed: January 2021
  • ridgewood_wpf1

  • ridgewood_wpf2

  • ridgewood_wpf3

  • ridgewood_wpf4

Let’s work together.

Contact us to find out how Southern Civil can help with your project.

Continue reading

Lyons WWTP Upgrades

Lyons WWTP
Upgrades Project

Lyons Wastewater Treatment Plant Upgrades

Lyons, Georgia

Southern Civil was part of a design build team to provide extensive upgrades to the North and East Wastewater Treatment Plants, both of which serve the City of Lyons. Our scope of work for each plant included: a new influent pump station and screening structure, installation of screen structure mechanical items; the installation of new blowers for the aeration system; new gear boxes for the clarifiers; dewatering and cleaning the existing package plant; inspection and repair of plant aeration equipment; sand blasting and paint of all ferrous metal in package plant.

  • Owner: City of Lyons
  • Engineer: Hoffstadter & Associates
  • Completed: December 2020
  • lyons_wwtp2

  • lyons_wwtp3

  • lyons_wwtp4

  • lyons_wwtp5

Let’s work together.

Contact us to find out how Southern Civil can help with your project.

Continue reading

Jesup Well #6

Jesup Well
No. 6 Project

Jesup Well No. 6

Jesup, Georgia

The project scope of work included: 1,600 GPM Floridian well; construction of a new pump house; installation of a 10,000-gallon mixing tank; water distribution piping, sanitary sewer piping; new chemical feed equipment; process controls; SCADA and electrical upgrades.

  • Owner: City of Jesup
  • Engineer: T.R. Long Engineering
  • Completed: January 2020
  • jesup_well2

  • jesup_well3

Let’s work together.

Contact us to find out how Southern Civil can help with your project.

Continue reading

Hinesville Bar Screen Upgrade

Hinesville Bar Screen
Upgrade Project

Hinesville Bar Screen Upgrade

Hinesville, Georgia

The scope of work for the project: a concrete basin approximately 30’ long, 8’ wide and 20.5’ deep with removable aluminum grates; connecting the concrete basin to an existing influent channel and manhole; installing a slide gate into the concrete channel; installing a 30” gate valve to the existing 30” DIP influent pipe; installing a Huber TrashMax bar screen; removing and replacing 55 square yards of concrete; removing and replacing chain-link fencing.

  • Owner: City of Hinesville
  • Engineer: Simonton Engineering
  • Completed: March 2021
  • hinesville_bar_screen2

  • hinesville_bar_screen3

  • hinesville_bar_screen4

Let’s work together.

Contact us to find out how Southern Civil can help with your project.

Continue reading

Hazlehurst Well

Hazlehurst
Well Project

Hazlehurst Well

Hazlehurst, Georgia

The scope of work for the project included: construction of a 1,000 GPM potable water well approximately 900 feet, construction of a new well house; mechanical piping; chemical feed systems; 625’ of 12” water line; electrical and SCADA installation.

  • Owner: City of Hazlehurst
  • Engineer: Turnipseed Engineers
  • Completed: December 2022
  • hazlehurst_well1

  • hazlehurst_well2

  • hazlehurst_well3

Let’s work together.

Contact us to find out how Southern Civil can help with your project.

Continue reading

SEDA Master Lift Station

SEDA Master Lift
Station Project

SEDA Master Lift Station

Savannah, Georgia

Scope of work on this project included: installation of the flow meter vault, plug valve manhole, and the air release valve manhole; installation of the generator and control panel maintenance pads; pump station mechanical piping; yard piping; installation of submersible pumps; Raven 405 Epoxy Coating on wet well and site manholes; installation of chain-link fencing; gravel paving.

  • Owner: Savannah Economic Development Authority
  • Engineer: Hussey Gay Bell
  • Completed: August 2020
  • seda_ls1

  • seda_ls2

  • seda_ls4

  • seda_ls6

  • seda_ls5

Let’s work together.

Contact us to find out how Southern Civil can help with your project.

Continue reading

Springfield Pump Station Crane

Springfield Pump Station
Crane Project

Springfield Pump Station Crane

Savannah, Georgia

The scope of work for the project included: construction of pile supported steel support columns; installation of 15-foot rail beam extension; extension of hoist track; electrical upgrades; construction of protecting bollards.

  • Owner: City of Savannah
  • Engineer: Collins Engineers, Inc.
  • Completed: August 2021
  • springfield_ps_crane1

  • springfield_ps_crane2

Let’s work together.

Contact us to find out how Southern Civil can help with your project.

Continue reading

Southeast Quadrant SWDI

Southeast Quadrant
SWDI Project

Southeast Quadrant SWDI

Savannah, Georgia

The Scope of work for this project included: the construction of pipe culvert concrete end wall with Fabriform revetment and security bar grating for triple 48” RCP; the construction of two pipe culvert concrete end walls with Fabriform revetment and security bar grating for triple 60” RCP; the construction of a 14’x20’ concrete junction box with cover; the construction of a 18’x18’ concrete junction box with cover.

  • Owner: Savannah-Hilton Head International Airport
  • Engineer: Coleman Company
  • Completed: September 2022
  • sc_southeast_quad2

  • sc_southeast_quad4

  • sc_southeast_quad3

Let’s work together.

Contact us to find out how Southern Civil can help with your project.

Continue reading

Savannah Quarters Lift Station

Savannah Quarters
Lift Station Project

Savannah Quarters Lift Station

Pooler, Georgia

The scope of the project included Master Lift Station with three 79.1 hp submersible pumps, 7,440 LF of 18” PVC force main installed by open cut, 1,007 LF of 18” RJ PVC force main installed by open cut, 4,776 LF of 18” FPVC force main installed by horizontal directional drill,1,493 LF of 18” FPVC force main installed in 24” FPVC casing by horizontal directional drill, and 110 LF of 18” FPVC force main installed in 24” steel casing by jack and bore.

  • Owner: City of Pooler
  • Engineer: Hussey Gay Bell
  • Completed: June 2023
  • ps_savannah2

  • ps_savannah3

  • ps_savannah4

  • ps_savannah5

Let’s work together.