Skip to main content

WPCP Clarifier Replacement

WPCP Clarifier Replacement
Project

WPCP Clarifier Replacement

Garden City, Georgia

The scope of work for the project included replacement of equipment for two 35-foot diameter clarifiers including demolition, removal and proper disposal of existing clarifier equipment and sludge removal. Procurement and installation of new clarifier equipment and associated electrical as required.

  • Owner: City of Garden City
  • Engineer: Brennan Jones Engineering Associates, LLC
  • Estimated Completion: July 2024

Let’s work together.

Contact us to find out how Southern Civil can help with your project.

Continue reading

Lyons WWTP Upgrades

Lyons WWTP
Upgrades Project

Lyons Wastewater Treatment Plant Upgrades

Lyons, Georgia

Southern Civil was part of a design build team to provide extensive upgrades to the North and East Wastewater Treatment Plants, both of which serve the City of Lyons. Our scope of work for each plant included: a new influent pump station and screening structure, installation of screen structure mechanical items; the installation of new blowers for the aeration system; new gear boxes for the clarifiers; dewatering and cleaning the existing package plant; inspection and repair of plant aeration equipment; sand blasting and paint of all ferrous metal in package plant.

  • Owner: City of Lyons
  • Engineer: Hoffstadter & Associates
  • Completed: December 2020
  • lyons_wwtp2

  • lyons_wwtp3

  • lyons_wwtp4

  • lyons_wwtp5

Let’s work together.

Contact us to find out how Southern Civil can help with your project.

Continue reading

Hinesville Bar Screen Upgrade

Hinesville Bar Screen
Upgrade Project

Hinesville Bar Screen Upgrade

Hinesville, Georgia

The scope of work for the project: a concrete basin approximately 30’ long, 8’ wide and 20.5’ deep with removable aluminum grates; connecting the concrete basin to an existing influent channel and manhole; installing a slide gate into the concrete channel; installing a 30” gate valve to the existing 30” DIP influent pipe; installing a Huber TrashMax bar screen; removing and replacing 55 square yards of concrete; removing and replacing chain-link fencing.

  • Owner: City of Hinesville
  • Engineer: Simonton Engineering
  • Completed: March 2021
  • hinesville_bar_screen2

  • hinesville_bar_screen3

  • hinesville_bar_screen4

Let’s work together.

Contact us to find out how Southern Civil can help with your project.

Continue reading

Harris C Hinley WRF Phase II Upgrades

Harris Hinley
Project

Harris C. Hinley WRF Phase II Upgrades

Springfield, Georgia

The scope of work for this project included demolition and removal of existing piping and appurtenant structures for two existing clarifiers; addition of a new secondary clarifier; construction of new piping and appurtenant structures for the new and existing clarifiers; demolition and removal of existing outfall section; addition of new outfall piping and appurtenant structures; construction of new miscellaneous pipe connections to new parts of the work; demolition, removal, and replacement of surface site features around construction areas; addition of a new sludge flow measurement system; addition of a new SCADA system. The work was completed while keeping the facility in full operation.

  • Owner: City of Springfield
  • Engineer: Integrated Science and Engineering
  • Competed: January 2023
  • wwtp_hh3

  • wwtp_hh4

  • wwtp_hh1

Let’s work together.

Contact us to find out how Southern Civil can help with your project.

Continue reading

Golden Isles Marina WWTP

Golden Isles Marina
WWTP Project

Golden Isles Marina Wastewater Treatment Plant

St Simons Island, Georgia

The scope of work for the project included: complete demolition and removal of existing plant; installation of new Pro-Water Wastewater Package Plant 30k gallons per day & Trojan UV disinfection Equipment; S.O.G. concrete equipment pad; yard piping; removal and disposal of existing solids; transfer of existing plant fluid & sludge; electrical connections.

  • Owner: Golden Isles Marina Master Association
  • Completion Date: July 2022
  • wwtp_cbw1

  • wwtp_cbw3

Let’s work together.

Contact us to find out how Southern Civil can help with your project.

Continue reading