Skip to main content

Author: brittany

Reidsville WWTP Effluent Pump Station Building

Reidsville WWTP Effluent Pump
Station Building

Reidsville WWTP Effluent Pump Station Building

Reidsville, Georgia

This project consists of the demolition and replacement of 4 Effluent Vertical Turbine Pumps, the demolition of the current effluent pump station building and the construction of a new effluent pump station building, including the mechanical piping and building control equipment.

  • Owner: City of Reidsville
  • General Contractor: McClendon Enterprises
  • Estimated Completion: TBD
  • reidsville

  • reidsville_2

Continue reading

City of Kingsland Lift Stations

City of Kingsland
Lift Station

City of Kingsland Lift Stations

Kingsland, Georgia

This project consists of the replacement of pumps in existing wet wells, new piping, coating of pump station interior and new electrical components.

  • Owner: City of Kingsland
  • Estimated Completion: June 2025

Continue reading

Bryan-Bulloch Transmission Main – Phase 3

Bryan-Bulloch Transmission
Main Phase 3

Bryan-Bulloch Transmission Main – Phase 3

Bryan County, Georgia

This project had four divisions of work. Division I involved the furnishment and installation of approximately 4,800 LF of 30–inch water main, and 1,500 LF of 16–inch water main including the directional drilling and jack and bores. Division II is the construction of a new 1,800 GPM deep Floridan Aquifer water well, wellhead piping, well building, hydropneumatic tank, electrical components, SCADA. Division III requires the installation of a five-pump booster pump station including the site work, building, piping, all electrical, SCADA, concrete, and other accessories. Division IV includes the furnishment and installation of a five-pump booster pump station and meter station along Highway 80, site work, building for the booster pump station, building for the meter station, piping, electrical, SCADA, concrete, and other accessories.

  • Owner: Bryan Co. Board of Commissioners
  • Engineer: Thomas & Hutton
  • Estimated Completion: June 2026
  • bryan-bulloch-transmission2

  • bryan-bulloch-transmission

  • DJI_0739_web

  • DJI_0749_web

  • DJI_0766_web

  • DJI_0771_web

  • DJI_0794_web

  • DJI_0818_web

  • DJI_0799_web

  • DJI_0828_web

  • DJI_0839_web

  • DJI_0861_web

  • DJI_0872_web

  • DJI_0880_web

Continue reading

Ford Ave Elevated Storage Tank – Altitude Valve

Ford Ave Elevated Storage Tank
Altitude Valve

Ford Ave Elevated Storage Tank – Altitude Valve

Richmond Hill, Georgia

The scope of work on this project includes: the construction of an altitude valve assembly, including associated isolation and check valves, piping and vault. This project also required the installation of an 80 gallon per minute booster package pump system, including electrical, SCADA, and all necessary appurtenances associated with the construction of the altitude valve and pump station as required to tie into the existing water and SCADA system.

  • Owner: City of Richmond Hill
  • Engineer: Thomas & Hutton
  • Estimated Completion: April 2025

Continue reading

Statesboro Wastewater Treatment Plant Blower Upgrades

Statesboro Wastewater
Treatment Plant
Blower Upgrades

Statesboro Wastewater Treatment Plant Blower Upgrades

Statesboro, Georgia

Installation of Two additional aeration basin blowers, bypass pumping system, electrical and instrumentation, piping, and related work and materials for modifications to the existing blower room and aeration basins at the Statesboro Wastewater Treatment Plant as shown in the plans and bid documents.

  • Owner: City of Statesboro
  • Engineer: Hussey Gay Bell
  • Estimated Completion: October 2025
  • statesboro_wwtp2

  • statesboro_wwtp

Continue reading

Mount Vernon Well House Improvements

Mount Vernon Well
House Project

Mount Vernon Well House Improvements

Mount Vernon, Georgia

The scope of work for the project included: demolition of existing Well House #2; construction of new Well House #2, mechanical piping for new well house; site improvements; gravel paving; fencing; electrical and SCADA installation, construction of addition to Well House #1, mechanical piping; electrical and SCADA upgrades.

  • Owner: City of Mount Vernon
  • Engineer: Turnipseed Engineers
  • Estimated Completion: August 2024
  • mount_vernon_1

  • mount_vernon_2

  • Mount_Vernon

  • mount_vernon_4

  • mount_vernon_3

  • mount_vernon_5

Continue reading

WPCP Clarifier Replacement

WPCP Clarifier Replacement
Project

WPCP Clarifier Replacement

Garden City, Georgia

The scope of work for the project included replacement of equipment for two 35-foot diameter clarifiers including demolition, removal and proper disposal of existing clarifier equipment and sludge removal. Procurement and installation of new clarifier equipment and associated electrical as required.

  • Owner: City of Garden City
  • Engineer: Brennan Jones Engineering Associates, LLC
  • Estimated Completion: July 2024

Continue reading

Sewerage System Improvements for City of Nahunta

Sewerage System Improvements
for Nahunta Project

Sewerage System Improvements for City of Nahunta

Nahunta, Georgia

The scope of work for this project included additions to the water pollution control plant to include construction of a screen and grit structure, a treatment plant complete with two trains of aeration basins, clarifiers and digesters, blowers, tertiary filters, ultraviolet disinfection system, a plant pump station, effluent pump station, sludge dewatering containers, control building, and blower building all complete with appurtenances.

  • Owner: City of Nahunta
  • Engineer: Turnipseed Engineers
  • Estimated Completion: April 2025
  • nahunta_5

  • nahunta_4

  • nahunta_3

  • nahunta_2

  • nahunta_1

  • nahunta1

  • nahunta2

  • nahunta3

  • nahunta4

  • nahunta5

  • nahunta6

  • nahunta7

  • nahunta8

  • nahunta9

  • nahunta10

  • nahunta11

  • nahunta12

  • nahunta13

  • IMG_1598_web

  • IMG_1674_web

  • IMG_1680_web

  • IMG_1681_web

  • IMG_1762_web

  • IMG_1802_web

  • IMG_1803_web

Continue reading

Bryan-Bulloch Transmission Main Phase II

Bryan-Bulloch Transmission Main
Phase II Project

Bryan-Bulloch Transmission Main Phase II

Bryan County, Georgia

The scope of work for the project included construction of a new 1,800 gallon per minute (GPM) potable water supply well in Bull County near US Highway 80. The work includes new 1,800 GPM deep Floridan Aquifer water well, wellhead piping, well building complete, electrical components, SCADA, and all necessary material, labor, and appurtenances associated with new water supply well.

  • Owner: Bryan County Board of Commissioners
  • Engineer: Thomas and Hutton
  • Project is currently in Preconstruction Phase
  • bb-phase2-2

  • bb-phase2

  • DJI_0869_web

  • DJI_0831_web

Continue reading

SEDA Manufacturing Center 0.6 MG Elevated Storage Tank

SEDA 0.6 MG
Tank Project

SEDA Manufacturing Center 0.6 MG Elevated Storage Tank

Savannah, Georgia

The scope of work for the project included: preliminary site work necessary for the construction of the water tank; installation of valve vault and valves; yard piping; installation of drain box and drain piping; grading; paving; and fencing.

  • Owner: Savannah Economic Development Authority
  • Engineer: Hussey Gay Bell
  • Estimated Completion: 2024
  • SEDA-tank2

  • SEDA-Tank

  • seda1

  • seda2

  • seda3

  • seda4

  • seda_DJI_0849_web

  • seda_DJI_0853_web

Continue reading